- | A conceptual model for computer-aided quality assurance system | Ha Sung Do; Park Ji Hyung; HWANG IN-SHIK; Kang Mu-jin; Hyong-Min Yeo |
- | A quality information model for enterprise-wide quality assurance system | Ha Sung Do; Park Ji Hyung; HWANG IN-SHIK; Kang Mu-jin |
- | A study on 3D CAD tolerance information handling for inspection planning | HWANG IN-SHIK; 이관복; Ha Sung Do |
- | A study on the development of knowledge-based inspection planning system for CMM | Ha Sung Do; HWANG IN-SHIK; Rho Hyung-Min |
- | CMM measurement planning in fapps | Ha Sung Do; HWANG IN-SHIK; PARK MYON WOONG; Rho Hyung-Min |
- | Development of 3D tolerance input and inspection planning system | Ha Sung Do; HWANG IN-SHIK; 이관복 |
- | Development of feature-based intelligent inspection planning system for CMM | Ha Sung Do; HWANG IN-SHIK |
- | Tolerance representation scheme for integrated cutting process & inspection planning | Ha Sung Do; HWANG IN-SHIK; 이관복; Rho Hyung-Min |
- | (Undefined) | Rho Hyung-Min; PARK MYON WOONG; Ha Sung Do; LEE CHUNG SOO; PARK JAE MIN; KIM JAE KWAN; Park Byoung-Tae; HWANG IN-SHIK; 이교일; 공상훈; 김용세; Eric Wang |