Full metadata record

DC Field Value Language
dc.contributor.author안영환-
dc.contributor.author강병하-
dc.contributor.author김석현-
dc.contributor.author이대영-
dc.date.accessioned2024-01-21T05:35:20Z-
dc.date.available2024-01-21T05:35:20Z-
dc.date.created2021-09-06-
dc.date.issued2005-02-
dc.identifier.issn1229-6422-
dc.identifier.urihttps://pubs.kist.re.kr/handle/201004/136770-
dc.description.abstractA comparative analysis of an ice storage system has been performed on the operation cost for the four control strategies, i.e., chiller priority and chiller downstream, chiller priority and chiller upstream, storage priority and chiller upstream, storage priority and chiller downstream. Main components of the ice storage system are an ice-on-coil storage tank and a screw compressor chiller. With the simulation program, the operation cost has been evaluated from the economics of an ice storage system. It is found that the operation cost of the ice storage system is strongly dependent on the control strategy, i.e., chiller priority or storage priority, but less affected by the arrangement method, i.e., chiller upstream or chiller downstream. In case of the maximum load day, the control strategy with chiller priority and chiller upstream is supposed to obtain the reduction of operation cost. However, it is found that the control strategy with storage priority and chiller downstream is the best economical operation for most summer seasons except the maximum load day.-
dc.publisher대한설비공학회-
dc.title빙축열 냉방시스템의 운전특성 및 비용 분석-
dc.title.alternativeThe Operation Characteristics and Cost Analysis of an Ice Thermal Storage System-
dc.typeArticle-
dc.description.journalClass2-
dc.identifier.bibliographicCitation설비공학 논문집, v.17, no.2, pp.156 - 164-
dc.citation.title설비공학 논문집-
dc.citation.volume17-
dc.citation.number2-
dc.citation.startPage156-
dc.citation.endPage164-
dc.description.journalRegisteredClasskci-
dc.identifier.kciidART001101878-
dc.subject.keywordAuthor빙축열시스템-
dc.subject.keywordAuthor운전방식-
dc.subject.keywordAuthor운전경비-
dc.subject.keywordAuthorIce storage system-
dc.subject.keywordAuthorOperation strategy-
dc.subject.keywordAuthorOperation cost-
Appears in Collections:
KIST Article > 2005
Files in This Item:
There are no files associated with this item.
Export
RIS (EndNote)
XLS (Excel)
XML

qrcode

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

BROWSE